The first works continued

Drilling down at turbine 1

Very sandy cores, note the topsoil in the second tray, 10m down

Drilling at turbine 2 site

Close up of the work

19 tonne track mounted CPT rig doing EFCP testing

back

Copyright 2012 SkyFarming Pty Ltd