The roads are finished with a layer of gravel and are now ready for the concrete trucks. Below is the road to turbine 2. The road to turbine 2 above and turbine 1 below. The intersection of the roads to turbine 1 and 2.
Excavating turbine 1.
Testing the compacted soil for the foundation.