The road works

Trenching and laying of the cables between the turbines and the switchroom. The communication cables are in conduits, the earthing is bare and the power cables, one per phase will be under protective safety covers.

Gravel being applied to the road as the final surface finish.

The view from T1.

Power cable joining.

Rolling the bottom of the excavation of T2 foundation.

back

Copyright 2012 SkyFarming Pty Ltd